Many homes do not need a new consumer unit for an EV charger — just a spare way and suitable protection. You are likely to need an upgrade if your fuse box is old (rewireable fuses, a plastic board, no RCD protection), full, or damaged. A replacement typically costs £400–£800 on top of the installation.
Signs your consumer unit may need upgrading
| What you see | What it usually means |
|---|---|
| Rewireable fuses (fuse wire in ceramic carriers) | Very old — replacement likely |
| Plastic consumer unit with no RCD | Older installation — replacement likely |
| Modern metal board with RCBOs or RCDs and a spare way | Usually fine as it is |
| Modern board but no spare ways | An additional small unit may be enough |
| Signs of scorching, buzzing or tripping | Needs an electrician regardless of the charger |
Upgrade vs adding a separate unit
If the existing board is in good condition but full, the installer can often fit a small separate enclosure just for the charger circuit, fed from the meter tails via suitable switchgear. That is cheaper than replacing the whole board. If the board is old or lacks modern protection, a full replacement is the safer route and brings the rest of the house up to date.
What a consumer unit upgrade costs
| Extra work | Typical range | When it applies |
|---|---|---|
| Extra cable beyond the included length | £15–£30 per metre | More if the run goes through several walls, a loft or along a garage. |
| Consumer unit (fuse box) upgrade | £400–£800 | Needed when the existing board is old, full or lacks suitable protection. |
| Earth rod (if required) | £100–£250 | Only if your charger has no built-in open-PEN protection on a PME supply. |
| Trenching or ducting under a drive or path | £300–£1,000+ | Depends on distance and surface — block paving and concrete cost more than gravel or lawn. |
| Main fuse upgrade by the network operator | Often no charge | Northern Powergrid handles this in the North East; your installer flags if it is needed. |
| Three-phase supply upgrade (for 22kW) | Can run into thousands | Rarely worthwhile for home charging — most cars charge at 7kW or 11kW on AC anyway. |
What to ask your installer
- Is a consumer unit change included in the quote, or excluded?
- Would an additional enclosure work instead?
- Will the rest of the house's circuits need testing, and could that reveal remedial work?
- How long will the power be off?