To install a home EV charger you need off-street parking (or a legal way to reach your car), an electricity supply with enough capacity, a consumer unit that can take a new circuit, a safe earthing arrangement, and a qualified electrician to install and certify it. Most homes with a driveway already meet these, sometimes with a small upgrade.
Checklist: what your home needs
| Requirement | What installers look for | If it is not met |
|---|---|---|
| Parking | A driveway, garage or private space near the house | See the no-driveway and flat guides |
| Main fuse | Typically 60A or more; 80A or 100A is common | Load management, or a fuse upgrade by the network operator |
| Consumer unit | A spare way and modern protection | A consumer unit upgrade or an additional small unit |
| Earthing | Safe protection for an outdoor chargepoint on a PME supply | A charger with built-in protection, or an earth rod |
| Cable route | A practical route from the consumer unit to the charger | Longer runs, ducting or a different charger position |
| Wi-Fi or data | A signal at the charger for smart features | A Wi-Fi extender, or a charger with mobile data |
| Permissions | Landlord, freeholder, conservation area or council if relevant | Sort these before booking |
Regulations installers must follow
Home chargepoints are installed to BS 7671 (the IET Wiring Regulations), with the IET Code of Practice for EV charging equipment as the industry guide. In England the work is notifiable under Part P of the Building Regulations, so it must be done by an electrician registered with a competent person scheme (such as NICEIC or NAPIT) or approved through building control. The charger itself must meet the smart charging regulations, and the installer notifies your network operator.
Main fuse and supply capacity
A 7kW charger draws about 32A for hours at a time. Your installer will check your main fuse rating and estimate your maximum demand alongside cooking, heating and other loads. Most chargers use a current clamp to reduce charging when the house is busy, so a 60A or larger fuse is usually fine. If the fuse is small, or your supply is shared with a neighbour, the network operator (Northern Powergrid in the North East) may need to upgrade it.
Consumer unit and earthing
The charger needs its own circuit with suitable RCD protection. Older boards often cannot take it safely — see do I need a new consumer unit?. Most homes have a PME earth, which needs extra protection for outdoor chargepoints — see PME earthing explained.
| Extra work | Typical range | When it applies |
|---|---|---|
| Extra cable beyond the included length | £15–£30 per metre | More if the run goes through several walls, a loft or along a garage. |
| Consumer unit (fuse box) upgrade | £400–£800 | Needed when the existing board is old, full or lacks suitable protection. |
| Earth rod (if required) | £100–£250 | Only if your charger has no built-in open-PEN protection on a PME supply. |
| Trenching or ducting under a drive or path | £300–£1,000+ | Depends on distance and surface — block paving and concrete cost more than gravel or lawn. |
| Main fuse upgrade by the network operator | Often no charge | Northern Powergrid handles this in the North East; your installer flags if it is needed. |
| Three-phase supply upgrade (for 22kW) | Can run into thousands | Rarely worthwhile for home charging — most cars charge at 7kW or 11kW on AC anyway. |
Next step
Use our installation checklist to prepare, then get a free quote. A standard installation typically costs £800–£1,200.
Ready to get started? Get a free quote, or browse popular EV chargers and how installation works for more background. Not sure an EV will save you money? Try our free EV savings calculator.