← All guides

Do I need planning permission for an EV charger?

Last updated

For most houses, no — a wall-mounted or free-standing charger in off-street parking is normally permitted development, so it does not need a planning application, as long as it meets the size and siting conditions.

You do need to check first if your home is a listed building, in a conservation area, a flat, or if the cable would cross a public pavement. Rules differ slightly between England, Scotland and Wales, so check your council's guidance if in doubt.

When you do and do not need permission

Planning and other consents for a home EV charger
SituationPlanning permission?Other consents to check
House with a drivewayNormally not — permitted developmentNone, beyond building regulations for the electrical work
Conservation areaUsually still permitted, but siting is more sensitiveCheck your council's conservation guidance, especially road-facing walls
Listed buildingPossiblyListed building consent is likely for fixing to the building
Flat or apartmentPermitted development rights can differFreeholder or management company consent
Cable across a public pavementNot a planning matterHighway authority (council) consent
New dropped kerb for a parking spaceSometimesCouncil approval for the vehicle crossing
General guidance only. Your local planning authority has the final say.

Permitted development conditions

Permitted development rights for EV charging points come with conditions on the size of the unit, its height (for free-standing posts), where it is sited in relation to the road, and that it serves an off-street parking space. The conditions have been relaxed in recent years to make home charging easier. Your installer will know the current limits, and a standard wall-mounted home charger comfortably falls within them.

Conservation areas and listed buildings in the North East

Parts of Jesmond, Durham City, Hexham, Morpeth and Yarm are conservation areas, and Durham has the cathedral and castle World Heritage Site. In these places, the visual impact of a charger on a road-facing wall matters more. A side or rear wall, a garage, or a free-standing post can be easier. For a listed building, speak to the council before installation.

Other permissions that are not planning

Planning is only one consent. Landlords, freeholders and councils (for pavements) all have their own say. See EV charger with no driveway and EV charger at a flat. The electrical work also needs building regulations compliance — see installation requirements.

Get a free quote and your installer will flag anything to check at the survey.

Ready to get started? Get a free quote, or browse popular EV chargers and how installation works for more background. Not sure an EV will save you money? Try our free EV savings calculator.

Frequently asked questions

Do I need planning permission to install an EV charger at home?

Usually not. A charger serving off-street parking at a house is normally permitted development, provided it meets the size and siting conditions.

Do I need permission in a conservation area?

A charger is often still permitted development, but siting is more sensitive. Check your council's guidance, especially for walls facing the road.

What about a listed building?

Fixing a charger to a listed building is likely to need listed building consent. Speak to your council before installation.

Do I need permission for a cable across the pavement?

Not planning permission, but you do need consent from the council as highway authority, and not every council allows it.

Related guides

EV charger installers in Northumberland

Get your home ready to charge.

GET MY FREE QUOTE