A standard home EV charger installation in Gateshead typically costs £800–£1,200 including a 7kW smart charger. The difference between the riverside terraces and the outer estates towards Low Fell and Wrekenton is often bigger than the difference between charger brands.
Typical prices in Gateshead
| What you are paying for | Typical range | What that assumes |
|---|---|---|
| Standard 7kW installation, charger included | £800–£1,200 | Short cable run (up to around 10m), modern consumer unit with space, wall-mounted near the parking spot. |
| Charger unit on its own | £400–£1,000+ | Simpler smart chargers sit at the lower end; solar-matching and premium units at the top. |
| Fitting only (you supply the charger) | £350–£650 | Fewer installers offer this, and you lose the single warranty point of a supplied-and-fitted job. |
How your part of Gateshead affects the price
Gateshead sits across the Tyne from Newcastle and shares much of its housing character: Victorian terraces near the riverside and town centre, with postwar and newer estates further out. In the outer estates, off-street parking is more common, so the typical job is a short cable run to a driveway or garage wall. In the riverside terraces, street parking is the norm, and a cable channel across a footpath needs Gateshead Council's permission before anyone can quote with confidence.
| Setup | What it usually involves | Rough total |
|---|---|---|
| Outer-estate home with a driveway | Short run, standard job | £800–£1,200 |
| Low Fell semi or villa, older electrics | Consumer unit upgrade possible | £1,000–£1,900 |
| Terrace with rear yard or back-lane parking | Run through the house or yard | £950–£1,600 |
| Terrace, street parking only | Gateshead Council permission first | Depends on permission |
Compare quotes like for like
Some quotes will include extras that others leave out: an earthing solution, a consumer unit upgrade, or making good after drilling. Ask installers to itemise, and see our earthing and installer-choice guides.
| Extra work | Typical range | When it applies |
|---|---|---|
| Extra cable beyond the included length | £15–£30 per metre | More if the run goes through several walls, a loft or along a garage. |
| Consumer unit (fuse box) upgrade | £400–£800 | Needed when the existing board is old, full or lacks suitable protection. |
| Earth rod (if required) | £100–£250 | Only if your charger has no built-in open-PEN protection on a PME supply. |
| Trenching or ducting under a drive or path | £300–£1,000+ | Depends on distance and surface — block paving and concrete cost more than gravel or lawn. |
| Main fuse upgrade by the network operator | Often no charge | Northern Powergrid handles this in the North East; your installer flags if it is needed. |
| Three-phase supply upgrade (for 22kW) | Can run into thousands | Rarely worthwhile for home charging — most cars charge at 7kW or 11kW on AC anyway. |
Next steps
Street parking? Read cable across the pavement in Gateshead. Local detail is on our Gateshead installer page. Get a free quote and we will help match you with a suitable local installer.
Ready to get started? Get a free quote, or browse popular EV chargers and how installation works for more background. Not sure an EV will save you money? Try our free EV savings calculator.