A semi-detached house is often the simplest home for an EV charger. With a driveway beside the house and a modern consumer unit, expect around £800–£1,200 including a 7kW smart charger.
What moves the price is where your consumer unit is in relation to your parking, and the age of your fuse board.
Typical costs for a semi-detached house
| Setup | What it usually involves | Rough total |
|---|---|---|
| Driveway at the side, consumer unit on the same side | Short, direct run through one wall | £800–£1,100 |
| Consumer unit on the opposite side of the house | Longer internal or external cable route | £950–£1,400 |
| Integral or attached garage | Charger in or on the garage near the supply | £800–£1,200 |
| Older 1930s–1970s fuse board | Consumer unit upgrade first | £1,200–£1,900 |
| Parking at the rear, or a detached garage | Long run, possibly ducted under a path | £1,300–£2,000 |
The three things that move the price
- Cable distance. Each extra metre costs roughly £15–£30. Mounting the charger nearer the consumer unit can save money — a long tethered cable or an untethered charger with a longer car cable can reach the car instead. See long cable runs.
- Consumer unit. Many 1930s–1970s semis have had piecemeal updates; if the board has no spare way or older protection, it may need upgrading. See consumer unit upgrades.
- Earthing. A charger with built-in open-PEN protection usually avoids an earth rod. See PME earthing explained.
All the extras in one place
| Extra work | Typical range | When it applies |
|---|---|---|
| Extra cable beyond the included length | £15–£30 per metre | More if the run goes through several walls, a loft or along a garage. |
| Consumer unit (fuse box) upgrade | £400–£800 | Needed when the existing board is old, full or lacks suitable protection. |
| Earth rod (if required) | £100–£250 | Only if your charger has no built-in open-PEN protection on a PME supply. |
| Trenching or ducting under a drive or path | £300–£1,000+ | Depends on distance and surface — block paving and concrete cost more than gravel or lawn. |
| Main fuse upgrade by the network operator | Often no charge | Northern Powergrid handles this in the North East; your installer flags if it is needed. |
| Three-phase supply upgrade (for 22kW) | Can run into thousands | Rarely worthwhile for home charging — most cars charge at 7kW or 11kW on AC anyway. |
Get a price for your semi
Tell us about your home, parking and consumer unit location and we will help match you with a suitable local installer. For the full breakdown, see our installation cost guide.
Ready to get started? Get a free quote, or browse popular EV chargers and how installation works for more background. Not sure an EV will save you money? Try our free EV savings calculator.