If you can park off the street — a front drive, rear yard or back-lane space — a charger at a terraced house typically costs £800–£1,200, the same as any other home. Older terraces more often need a consumer unit upgrade, which can take the total to £1,300–£2,000.
If you can only park on the street, the question is not price but permission: any cable across the pavement needs the council's consent. Here is how both situations work.
Typical costs for a terraced house
| Setup | What it usually involves | Rough total |
|---|---|---|
| Front driveway or forecourt, modern fuse board | Short run through the front wall | £800–£1,200 |
| Rear yard or back-lane parking | Run through the house or along the yard wall | £950–£1,500 |
| Older fuse board that needs replacing | Consumer unit upgrade before the charger | £1,300–£2,000 |
| Stone or very thick walls, awkward route | More drilling, cable management and making good | Add £100–£300 |
| On-street parking only | Council permission for a pavement channel first | Depends on permission |
Why terraces are often more complex
Terraced houses, especially Victorian and Edwardian ones, often have the consumer unit and meter in a cellar, under the stairs or in the hallway, a long way from a rear yard. Older boards may have rewireable fuses or no spare ways, and some older terraces share a "looped" supply with a neighbour, which the network operator may need to separate before a charger is added. None of these rule a charger out, but they explain why quotes vary.
| Extra work | Typical range | When it applies |
|---|---|---|
| Extra cable beyond the included length | £15–£30 per metre | More if the run goes through several walls, a loft or along a garage. |
| Consumer unit (fuse box) upgrade | £400–£800 | Needed when the existing board is old, full or lacks suitable protection. |
| Earth rod (if required) | £100–£250 | Only if your charger has no built-in open-PEN protection on a PME supply. |
| Trenching or ducting under a drive or path | £300–£1,000+ | Depends on distance and surface — block paving and concrete cost more than gravel or lawn. |
| Main fuse upgrade by the network operator | Often no charge | Northern Powergrid handles this in the North East; your installer flags if it is needed. |
| Three-phase supply upgrade (for 22kW) | Can run into thousands | Rarely worthwhile for home charging — most cars charge at 7kW or 11kW on AC anyway. |
If you only have street parking
Do not run a cable across the pavement without permission. Some councils allow purpose-made channels set into the footway; others do not yet. Read EV charger with no driveway and our council guides for Newcastle, Durham, Sunderland and Gateshead.
How to get an accurate price
Send photos of your consumer unit, meter and main fuse, and the route to where you park. Tell us about your terrace and parking and we will help match you with a suitable local installer. Compare with semi-detached and detached costs.
Ready to get started? Get a free quote, or browse popular EV chargers and how installation works for more background. Not sure an EV will save you money? Try our free EV savings calculator.