Commercial EV charging is about matching chargers to how long vehicles stay: 7–22kW AC chargers suit staff and fleet vehicles parked for hours, while rapid DC chargers suit short customer visits. Most multi-charger sites need load management and a check of the site's supply, and eligible organisations may be able to claim through the government's Workplace Charging Scheme.
Commercial EV charger installation covers a broader range of situations than a single home charger: staff car parks, customer parking at retail or hospitality sites, and dedicated charging for a company fleet. The right setup depends heavily on how many vehicles need to charge, how often, and whether charging needs to happen simultaneously across multiple bays.
Multi-charger commercial sites usually need load management — software or hardware that shares available electrical capacity across chargers so they don't all draw full power at once and trip the site's supply. This is a bigger consideration for businesses than it is for a single home installation, and it's worth discussing early with whoever assesses your site.
Businesses, charities and public sector organisations installing workplace chargepoints may also be able to claim towards the cost through the government's Workplace Charging Scheme — our EV charger grants guide covers the current position on that scheme alongside the separate scheme for renters and flat owners.
Number of vehicles
Staff, customer and fleet charging all have different demand patterns — worth thinking through before you get quotes.
Load management
Multiple chargers on one site usually need load management to share available electrical capacity safely.
Workplace Charging Scheme
Eligible businesses, charities and public sector bodies may be able to claim towards installation costs.
Site electrical capacity
Larger commercial installations may need an assessment of whether your site’s incoming supply can support the load.
Which chargers suit which site
| Use | Typical dwell time | Usual charger |
|---|---|---|
| Staff car park | All day | 7kW AC per bay, load managed |
| Company fleet depot | Overnight | 7–22kW AC, scheduled and load managed |
| Hotel, pub or restaurant | 1–3 hours or overnight | 7–22kW AC |
| Retail or leisure | 30–90 minutes | 22kW AC or rapid DC |
| Quick-turnaround fleet | Minutes | Rapid DC |
Planning a commercial installation
- Demand. How many vehicles, how long they stay and how much charge they need.
- Site capacity. Your incoming supply may limit how many chargers can run at once; larger schemes may need an application to the network operator.
- Load management. Shares capacity across chargers so they do not overload the supply.
- Back office. Access control, user billing, fleet reporting and tariffs.
- Groundworks and layout. Bay positions, cable routes, accessibility and signage.
- Future expansion. Ducting for extra bays now is cheaper than digging twice.
Chargers open to the public
If customers or the public can use your chargers, extra rules apply under the Public Charge Point Regulations 2023, such as contactless payment on new chargers of 8kW and above and clear pricing. Accessibility guidance (PAS 1899) is also worth following for bay design. Your installer should advise on what applies.
Grants for businesses
The Workplace Charging Scheme has offered vouchers per socket to eligible businesses, charities and public sector organisations. Amounts and rules change — check GOV.UK, and see our EV charger grants guide.
Tell us about your site, vehicles and timescales in the quote form and we will help connect you with an installer experienced in commercial work across the North East.
Common questions
What chargers does a workplace need?
For staff parked all day, 7kW AC chargers with load management are usually enough and the most cost-effective. Rapid chargers suit short visits.
Do public chargers at my business have to take contactless?
New public chargers of 8kW and above have to offer contactless payment under the Public Charge Point Regulations 2023. Ask your installer what applies to your site.
Can businesses get a grant towards installation?
Eligible businesses, charities and public sector organisations may be able to claim through the Workplace Charging Scheme — see our grants guide.
What's load management and do we need it?
It's software or hardware that shares available power across multiple chargers. Sites with more than a couple of chargers usually need it.
Do you install chargers for fleets?
We're a free matching service — tell us about your site and fleet needs and we'll help connect you with a suitable local installer experienced in commercial work.
Guides that go deeper
Other services we can help with
Get Me A Wallbox is a free lead-generation and matching service — we help connect your enquiry with a suitable local installer, and don't carry out installations ourselves. See our areas we cover for the North East locations we currently serve.